Manufacturing process flow

Scrap metal to ingot casting, 500 kg tilting furnace

  1. Scrap collection (raw material)

    Collect scrap metal from approved sources. Check the material for contamination, moisture and unwanted substances.

    Aluminium scrap collected in a scrap yard with an excavator
  2. Sorting and segregation

    Separate scrap by metal type, grade, size and composition. Remove non-metallic materials and incompatible metals.

    Workers sorting aluminium scrap by alloy on a sorting line
  3. Weighing and preparation

    Weigh and record the batch. Prepare the scrap for furnace charging; clean and dry it as required for the material and process.

    Aluminium scrap weighed on a platform scale before charging the furnace
  4. Melting, 500 kg tilting furnace

    Charge prepared scrap in a controlled manner and melt using the temperature and holding time specified for the metal alloy.

    Operator at a 500 kg induction melting furnace
  5. Melt treatment and quality check

    Where applicable, remove dross, check chemical composition and adjust the alloy to meet the required specification.

    Molten aluminium poured from a tilting furnace into a casting pit
  6. Ingot casting

    Transfer molten metal safely into suitable ingot moulds and allow it to solidify under controlled conditions.

    Molten aluminium poured into ingot moulds on a conveyor
  7. Inspection and storage

    Inspect appearance and dimensions, perform required tests, label the batch and store accepted ingots.

    Worker inspecting labelled pallets of aluminium ingots

Incoming check

Visual inspection of every lot for contamination and consistency.

Grade control

Lots are kept apart and labelled so what we quote is what we load.

Pre-dispatch release

Final weights, photos and paperwork reviewed before sealing.